Solar EPC and EV charging network operations across Central India and metro cities.
AT BiZ has delivered work spanning solar EPC execution and land acquisition for utility-scale solar projects, working for Giants in the space. We also partner Players in EV Charging and Quick (Battery) Interchange Network O & M in Metro zones.
Both lines of work draw on the same core strength: field execution in geographically complex environments, managed by teams with strong ground-level networks across government, communities, and local administration.
PCC and Fabrication work.
Negotiation and closure of land parcels for solar projects in complex rural environments.
End-to-end engineering, procurement and construction for solar power plant projects
Operations management for battery quick interchange stations across metro cities.
AT BiZ leveraged its two-decade network of relationships with local administration, revenue authorities, and community leaders to unlock the non-technical blockers that delay infrastructure and renewable energy projects — land, permissions, and local cooperation.
Negotiation with multiple landowners in parallel, with revenue authority coordination and community alignment managed entirely in-house.
Full solar project delivery from site survey and engineering through civil construction, electrical work, and commissioning.
Station-level uptime management, maintenance scheduling and field supervision for battery quick interchange networks across metro cities.
Survey, land negotiation, revenue coordination and all pre-construction clearances
Design, BOQ preparation and equipment sourcing for project execution
Construction, electrical work and quality supervision through to commissioning
Documentation, handover and optional ongoing operations management post-commissioning
Good teamwork by vendor controls through meticulous planning, management and coordination of field resources ensuring high network uptime achieving SLA. Ensures smooth, uninterrupted site Operations. Consistently achieves high uptime targets. Fully adheres to all industry and safety standards.
Arun Gupta
Area O&M Head, Quippo Telecom (2010-11)
A trusted partner for mobile tower operation and maintenance. Skilled team, maintains proper trackers for timely execution of preventive maintenance, adhere to SLA requirements, and proactively identify issues before they become outages. Their coordinated field management, corrective actions have improved network availability and reduced MTTR. We value their professionalism and consistent results.
Kuldeep Jain
Area O&M Head, Viom Networks (2011-12)
Excellent project management through meticulous planning and the use of detailed phase wise time charts. Their disciplined execution ensures that all project milestones are met consistently and within the established timelines.
Yogesh Womborikar
Planning Head, Essel Urja (2014-15)
Exceptional work on the solar project! Excellent capability to manage ground-level challenges while maintaining 100% compliance. Thank you for leading our push toward a greener future.
Gaurav Singhal
Rays Power Infra (2016-18)
Land Acquisition- “A meticulous team that tackled a challenging, large-scale land acquisition through superb planning. They excelled at on-ground coordination with local residents, revenue officers, and the state power company to ensure a smooth execution.
Narendra Verma
Project Head Essel Urja (2014-15)
Seem less and timely execution of Optical fibre project. Seem less and timely execution of Optical fibre project. Exceptional performance during the optical fiber deployment. Their technical expertise and dedication were critical to the success of this high-speed network infrastructure project.
Ajay Jain
SCM Manager RIL (2024-26)
Taking full ownership of every phase of the project lifecycle, implementing “Right First Time” (RFT) practices to reduce rework. A strong, highly adaptable testimonial for an optical fiber project team highlights technical expertise, on-time delivery, and seamless problem-solving.
Govind Sharma
Area Manager, RIL (2018-22)
Demonstrating a consistent commitment to the project’s success, effectively balancing manpower and materials to maintain momentum.
RK Singh
Construction Manager, Idea (2015-16)
Commendable teamwork and diligent management of Passive infra-Maintenance. Consistent in delivering smooth operations, maintain impressive uptime records, and ensure 100% compliance with all technical requirements.
Harish Sharma
COH BIL (2016-18)
A credible vendor with astonishing performance record on ground through effectively planned operations through motivated teams . Management positive mindset who strive towards continuous improvement to achieve excellence to ensure improving uptime trends and achieving targeted SLA milestones is a testimony of the overall team efforts . Overall a dependable and trusted partner with strong know how of business and inherent challenges on ground .
Vikas Lakhanpal
South Asia SCM head ATC (2015-26)
AT BiZ delivers dependable solutions to keep your operations running smoothly.